The Compact · A Roger Sherman Holdings Publication
MERIDIAN

MeridianArchive › 2026-08-27

This page is the permanent record — kept in English by design. Every Meridian entry lives at one canonical URL, in one authoritative language, so it can be cited, linked, and verified years from now without translation drift. Translated editions of today’s coverage are available in the daily brief. → Read today’s brief in your language

2026-08-27 · Logged by the Meridian desk

EBA Drafts Technical Standards on Operational Risk Management

EUNOTABLERegulation proposedModel risk

What changed

The EBA published draft Regulatory Technical Standards under CRR3 Article 323(2), specifying institutions' operational risk obligations set out in Article 323(1), points (a) to (h), scaled to each institution's size and complexity.

Who this touches

Banks and other credit institutions regulated under the EU Capital Requirements Regulation.

Why it matters

The draft turns a broad legal obligation into a standard institutions can be measured against, with size and complexity determining how much evidence is expected.

Suggested next step — and why

Institutions might map current operational risk documentation against Article 323(1), points (a) to (h), with their own advisers before the RTS is finalized.

The clock

Consultation stage is open; the source gives no closing date for comment or effective date.

The editor's read

The obligation under Article 323(1) already exists — what the RTS specifies is what counts as evidence of meeting it. Documentation sized to institutional complexity means untracked practice and no practice will read the same. — IDV

Primary source: European Banking Authority — read in the original, not from coverage. Source ID: eu-eba

Permanent record: this page is public forever. "When did we know?" always has a URL.

Curated nightly by Dr. Ivan Del Valle — AI governance architect, editor of The Compact. Disagree with a reading? Write ivan.delvalle@rsit.ai — every message is read, most are answered. Corrections are published, not buried. · Today's brief · Method · Reporting free forever; the desk is sustained by its data plans.